翻訳と辞書
Words near each other
・ Te Taka Keegan
・ Te Tapuwae
・ Te Tatua-a-Riukiuta
・ Te Tawharau
・ Te Teko
・ Te Tiarama
・ Te Tipua
・ Te Tirarau Kukupa
・ Te Toiroa Tahuriorangi
・ Te Tomairangi Marae
・ Te Tse (Cyrillic)
・ Te Ture Whenua Māori Act 1993
・ Te Tuve Y Te Perdi
・ Te Uenuku
・ Te Uira
Te Uku Wind Farm
・ Te Umanibong
・ Te Urewera
・ Te Urewera National Park
・ Te Uri-o-Hau
・ Te Uruhina McGarvey-Tiakiwai
・ Te Ururoa Flavell
・ Te Vaka
・ Te Vaka (album)
・ Te Vakai
・ Te Voy a Enamorar
・ Te voy a enseñar a querer
・ Te Voy A Esperar
・ Te Voy A Perder
・ Te Waaka Perohuka


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Te Uku Wind Farm : ウィキペディア英語版
Te Uku Wind Farm

Te Uku Wind Farm is a wind farm at Te Uku near Raglan, New Zealand. It has a capacity of 64MW〔(【引用サイトリンク】title=Project Te Uku )〕〔(【引用サイトリンク】publisher=WEL Networks )〕 using 28 wind turbines. Construction was completed in March 2011, at a cost of $200 million. The farm covers an area of approximately .〔(【引用サイトリンク】publisher=WEL Networks Ltd )〕 The wind farm is jointly owned by WEL Networks and Meridian Energy.
Resource consent was granted in May 2008 and appeals were resolved by November 2008. Construction of the wind farm began in 2010. Hick Bros Civil and Spartan Construction won an award for outstanding technical and environmental planning.〔(【引用サイトリンク】title=Hick Bros & Spartan pick up prize for building Te Uku Wind Farm )〕 The wind farm was officially opened by the Prime Minister in February 2011. Te Uku was fully operational on 10 March 2011.
Te Uku Windfarm is controlled from Twizel.〔Raglan Chronicle 26 November 2010 page 3〕(Twizel control centre was set up for the Waitaki power scheme. )
== Construction ==

Each 130.5 m. high, 318 tonne, turbine took 2 or 3 days to build using 4 cranes, the largest a 600 tonne KR Wind/NZ Crane Group Alliance crane. Towers were formed in 3 concrete sections (made in Korea), and topped by Siemens components (as at Makara) - a 3.5 m circumference, 81 tonne nacelle, hub and 3 turbine blades. Barge transport was considered, but rejected in favour of road transporters running from September 2010 to January 2011.〔(【引用サイトリンク】title=First Turbine Goes Up At Te Uku Wind Farm )

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)